Mid-Term Portfolio

 

Portfolios are due the session before break. All work should be fixed using spray fixative under the hood in the spray-room (Riley 315). All work must include the student's printed name and the date the assignment was completed. Work should be removed from your drawing pads and clipped together using binder or bulldog clips in chronological order with the earliest item on top and the most recent drawing on the bottom. For additional protection, it is strongly recommended that you place your bound work in your portfolio for submission.

 

If you are not satisfied with your drawing on any given day, replacement work is permitted. Simply place your name and the same date as the original on the replacment drawing and label it "Replacement" and insert it behind the original. Besides improving your evaluation for that assignment, this extra effort will count toward the effort score in the overall rubric.

Assignments and Dates

Negative Shape Drawing

2016-01-18

Blind Contour

2016-01-20

Partial-Peak Contour Drawing

2016-01-20

Figure Gestures (3)

2016-01-25

1 Interior, 1 Still Life, 1 4-part Gesture

2016-01-27

1 4-Part, 1 Page Thumbnail Gestures

2016-02-01

Imaginary Eggs

2016-02-03

Simple Volumes

2016-02-10

Complex Volumes

2016-02-17

Organizational Line Interior

2016-02-22

Organizational Line Still Life

2016-03-02

Please reload